Integrated sewage treatment equipment series
Grille decontamination machine series
Gate hoist series
Material conveying series
Blender Series
Scraper and suction dredger series
Aerator and packing series
Air floatation device series
Filter Series
Disinfection and dosing series
Sludge dewatering series
Membrane Product Series
1. Check if all valves are intact and open flexibly. 2. Ensure that the water pump rotates flexibly and there are no hidden dangers that may affect normal operation. If discovered, promptly eliminate them. 3. The aeration pipeline must be at the same horizontal plane, and the filling material should be checked for detachment. If there is detachment, it should be promptly replenished. 4. Check whether each electrical circuit is in a ready working state and whether the wiring method is correct. If any abnormalities are found, they should be corrected in a timely manner to ensure safety.
Contact: Manager Shao Contact phone number: 1377-1332-260 Contact email:hongtuhb@163.com Contact address: Gaogong Road, Gaocheng Town, Yixing City, Jiangsu Province
All rights reserved @ Yixing Hongtu Environmental Protection Equipment Co., Ltd. Record number:苏ICP备14037336号-1